Mettur : 48,000 TPA of caustic soda; 42,000 TPA of chlorine
Karaikal : 54,750 TPA of caustic soda; 48,508 TPA of chlorine.
The integrated membrane cell plant sources salt from the company's own salt works at Vedaranyam. The division generates all the power at its own facility.
Mettur : 48.5 MW coal based power plant
Karaikal : 13 MW gas based DG sets