|
| 2006-07: Re-entered the pipes segment through the acquisition of a 22,000 tpa manufacturing facility in Ponneri near Chennai |
2007-08: Expanded the PVC pipes capacity at Ponneri to 36,000 tpa
Commenced the manufacture of PVC fittings |
| 2008-09: Commissioning of a 20,000 tpa greenfield PVC pipes facility in Devarwadi, Shinoli, Maharashtra, enhancing capacity to 56,000 tpa. |
 |
|
|